Supply, manufacture, assembly, and testing of converter 3’s primary dedusting system.
Project’s main phases:
* Manufacture of metal structures, pipe rack, ducts and piping;
* Assembly of the gas collecting and cooling hood, ducts and pipe-rack, heat exchangers, gas washer of the steel mill’s converter # 3; launching of power cables, and control and assembly of transformers, electric panels and instrumentation.
We work in partnership with K.H.I - Kawasaki Heavy Industries, Ltd, for the supply, manufacture, assembly, and testing of a new dry seal gas holder for ArcelorMittal Tubarão.
Project’s main phases:
1. Project’s civil engineering detailing.
2. Supply of materials for the manufacture of gas holder, ducts, metal structures for pipe-racks, piping, conduits, cables and trays.
3. Manufacture of gas holder, metal structures for pipe-racks, ducts and piping.
4. Construction of bases for equipment, electric envelope and electric room.
5. Assembly of gas holder, ducts and pipe-racks, boosters fans, replacement of gas washers of the steel mill’s converters # 1 and # 2, launching of power cables, and control and assembly of transformers, electric panels and instrumentation.
Construction and assembly of the New Seawater System/DN 2500 trunk system/ DN 1800/1500/1200 derivatives, Valves installation/ Dresser joints/Flow meter/ Temperature/Pressure/ Coaltar-Epoxi internal treatment/ 100% ultrasonic welds/ Tests with Holiday Detector/Coating with thermo-retractable sheathing/Lowering of the water table/Cathodic Protection.
Project’s main phases:
* Manufacture engineering, logistics, and construction planning for the activities to be performed in Vitória/ES and in São Luiz/MA;
* Pre-manufacture of 2010 tons in Vitória/ES;
* Special overland transportation to São Luís/MA;
* Construction of pipe-shop next to the plant with 300 tons/month production capacity;
* Pre-assembly and painting of the 2010 tons of ducts.